Data

NRS-15462 | Estimate for the northern railway approach of the Sydney Harbour Bridge from Bay Road Station to North Sydney Station

NSW State Archives Collection
AGY-1897 | Sydney Harbour and City Transit Branch (1912-1913) Metropolitan Railway Construction Branch (1913-1916)
Viewed: [[ro.stat.viewed]] Cited: [[ro.stat.cited]] Accessed: [[ro.stat.accessed]]
ctx_ver=Z39.88-2004&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Adc&rfr_id=info%3Asid%2FANDS&rft_id=https://search.records.nsw.gov.au/permalink/f/1ednqkf/ADLIB_RNSW110015493&rft.title=NRS-15462 | Estimate for the northern railway approach of the Sydney Harbour Bridge from Bay Road Station to North Sydney Station&rft.identifier=https://search.records.nsw.gov.au/permalink/f/1ednqkf/ADLIB_RNSW110015493&rft.publisher=Transport for NSW&rft.description=This volume comprises the calculations and plans for the estimate of the northern railway approach for the Sydney Harbour Bridge from Bay Road Station to North Sydney Station. Attention is given to the tunnels, bridges and trackwork, excavation and railway stations. The volume is signed by J.J.C. Bradfield, Chief Engineer, Sydney Harbour Bridge but is not dated.Neither the volume nor the individual plans are dated. In estimating a date for this volume it has been assumed that the costings were complete before the call for tenders for the arch bridge in 1923.Custody HistoryThis record was handed to the Archives Authority on 11 June 1968 by the Bradfield family. It was apparently an archival estray.&rft.creator=AGY-1897 | Sydney Harbour and City Transit Branch (1912-1913) Metropolitan Railway Construction Branch (1913-1916) &rft_subject=HISTORICAL STUDIES&rft_subject=HISTORY AND ARCHAEOLOGY&rft.type=dataset&rft.language=English Access the data

Access:

Other view details

Item lists are available online

Full description

This volume comprises the calculations and plans for the estimate of the northern railway approach for the Sydney Harbour Bridge from Bay Road Station to North Sydney Station. Attention is given to the tunnels, bridges and trackwork, excavation and railway stations.

The volume is signed by J.J.C. Bradfield, Chief Engineer, Sydney Harbour Bridge but is not dated.

Neither the volume nor the individual plans are dated. In estimating a date for this volume it has been assumed that the costings were complete before the call for tenders for the arch bridge in 1923.

Custody History
This record was handed to the Archives Authority on 11 June 1968 by the Bradfield family. It was apparently an archival estray.

Created: 1923-01-01 to 1923-01-01

Data time period: 1923-01-01 to 1923-01-01

This dataset is part of a larger collection

Subjects

User Contributed Tags    

Login to tag this record with meaningful keywords to make it easier to discover