Data

VPRS 20234 Metro Tunnel Rail Project Early Works - As-Built Drawings

Public Record Office Victoria
Victorian Infrastructure Delivery Authority (previously known as Major Transport Infrastructure Authority 2019-2024)
Viewed: [[ro.stat.viewed]] Cited: [[ro.stat.cited]] Accessed: [[ro.stat.accessed]]
ctx_ver=Z39.88-2004&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Adc&rfr_id=info%3Asid%2FANDS&rft_id=https://prov.vic.gov.au/archive/VPRS20234&rft.title=VPRS 20234 Metro Tunnel Rail Project Early Works - As-Built Drawings&rft.identifier=https://prov.vic.gov.au/archive/VPRS20234&rft.publisher=Public Record Office Victoria&rft.description=This series contains the As-Built drawings that were used in completion of the Melbourne Metro Tunnel Rail Project Early Works project and were provided to the Department of Transport and Planning for Rail Transport Operators to utilise for maintenance and operation purposes.  The drawings document the As-Built conditions of the areas and locations impacted by the project. Information recorded against each drawing can include the project discipline, design package, company that provided the drawing, geographic or project area, and drawing number. The Early Works project phase focused on preparing for the commencement of the main tunnel and stations works. Early works included utility service relocation and works to prepare construction sites. The Metro Tunnel Project involved construction of twin nine-kilometre rail tunnels throughout the Melbourne central business district from South Kensington to South Yarra with five new underground stations along the route.&rft.creator=Victorian Infrastructure Delivery Authority (previously known as Major Transport Infrastructure Authority 2019-2024) &rft.date=2025&rft.coverage=141.000000,-34.000000 142.919336,-34.145604 144.582129,-35.659230 147.742627,-35.873175 150.024219,-37.529041 150.200000,-39.200000 141.000000,-39.200000 141.000000,-34.000000 141.000000,-34.000000&rft_subject=HISTORICAL STUDIES&rft_subject=HISTORY AND ARCHAEOLOGY&rft.type=dataset&rft.language=English Access the data

Access:

Restrictions apply view details

Closed

Full description

This series contains the As-Built drawings that were used in completion of the Melbourne Metro Tunnel Rail Project Early Works project and were provided to the Department of Transport and Planning for Rail Transport Operators to utilise for maintenance and operation purposes. 

The drawings document the As-Built conditions of the areas and locations impacted by the project.

Information recorded against each drawing can include the project discipline, design package, company that provided the drawing, geographic or project area, and drawing number.

The Early Works project phase focused on preparing for the commencement of the main tunnel and stations works. Early works included utility service relocation and works to prepare construction sites.

The Metro Tunnel Project involved construction of twin nine-kilometre rail tunnels throughout the Melbourne central business district from South Kensington to South Yarra with five new underground stations along the route.

Data time period: [2017 TO 2019]

This dataset is part of a larger collection

141,-34 142.91934,-34.1456 144.58213,-35.65923 147.74263,-35.87318 150.02422,-37.52904 150.2,-39.2 141,-39.2 141,-34

145.6,-36.6

Subjects

User Contributed Tags    

Login to tag this record with meaningful keywords to make it easier to discover