Full description
Lineage
Maintenance and Update Frequency: asNeededNotes
PurposeProvided to Geoscience Australia as part of an agreement between Survey Companies and Parks Australia and to increase the Bathymetric data coverage of Australia. EGS was contracted by OMS Group to supply topographic, hydrographic, geophysical and geotechnical survey services to provide data to enable OMS Group to carry out engineering, construction and subsequent maintenance of the SSCN cable system. The primary objective of the cable route survey activities was to identify hazards and thereby allow OMS Group to engineer a secure, technically and economically viable route for the system. This enables exact cable lengths, cable design and installation parameters to be defined to minimise problems over the designated life of the system.
Created: 02 06 2024
Modified: 26 02 2025
Data time period: 2024-04-17 to 2024-05-04
text: westlimit=131.25; southlimit=-36.71; eastlimit=131.50; northlimit=-36.50; projection=WGS 84 / geographic 2D (EPSG: 4326)
text: uplimit=-5587.4; downlimit=-5599; projection=MSL depth / vertical (EPSG: 5715)
User Contributed Tags
Login to tag this record with meaningful keywords to make it easier to discover
Great Australian Bight Marine Park Bathymetry 2024 100m (zip) [66 KB]
- DOI : 10.26186/150168
- Local : pid.geoscience.gov.au/dataset/ga/150168
- global : c386364f-2470-4827-bea3-2148d9c5ab00