Brief description
This record was harvested by RDA at 2023-12-06T09:51:50.658+11:00 from NCI's Data Catalogue where it was last modified at 2019-02-26T15:51:09.Full description
Over eight days in March and a further three days in July 2012, MT data were collected at 65 sites in the Hillside Project Area, Yorke Peninsula, South Australia. This covered an area approximately 2 km by 1 km, with an inter-site spacing of 250 m. This study involved interpreting aspects of a copper-gold ore deposit below shallow cover rocks.Lineage
NACreated: 26 02 2019
Issued: 26 02 2019
Modified: 12 01 2023
Data time period: 2012-03-01 to 2012-07-31
text: northlimit=-34.52; southlimit=-34.55; westlimit=137.86; eastLimit=137.9
User Contributed Tags
Login to tag this record with meaningful keywords to make it easier to discover
Carter, S. (2012). Magnetotelluric and Seismic Joint Inversion using Nelder-Mead Minimization. Thesis (B.Sc.(Hons)) -- University of Adelaide, School of Earth and Environmental Sciences.
url :
https://digital.library.adelaide.edu.au/dspace/handle/2440/92056
Carter, S. (2012). Magnetotelluric and Seismic Joint Inversion using Nelder-Mead Minimization. Thesis (B.Sc.(Hons)) -- University of Adelaide, School of Earth and Environmental Sciences.
url :
https://digital.library.adelaide.edu.au/dspace/bitstream/2440/92056/1/02wholeGeoHon.pdf
- DOI : 10.25914/5BEA503AAF48A
- URI : geonetwork.nci.org.au/geonetwork/srv/eng/catalog.search#/metadata/f7519_9143_7073_9260
- global : f7519_9143_7073_9260