Data

Magnetotelluric surveys of the Flinders Ranges, South Australia as part of the Australian Lithospheric Architecture Magnetotelluric Project (AusLAMP) (Level 0 concatenated ASCII time series per run)

National Computational Infrastructure
Rees, Nigel ; Hollmann, Hannes ; Goleby, Bruce
Viewed: [[ro.stat.viewed]] Cited: [[ro.stat.cited]] Accessed: [[ro.stat.accessed]]
ctx_ver=Z39.88-2004&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Adc&rfr_id=info%3Asid%2FANDS&rft_id=info:doi10.25914/9tva-fv38&rft.title=Magnetotelluric surveys of the Flinders Ranges, South Australia as part of the Australian Lithospheric Architecture Magnetotelluric Project (AusLAMP) (Level 0 concatenated ASCII time series per run)&rft.identifier=10.25914/9tva-fv38&rft.publisher=NCI Australia&rft.description=Long-period magnetotelluric (MT) time series data that measure natural magnetic and electric field variations at Earth’s surface were collected at various locations throughout the Flinders Ranges, South Australia. This time series dataset was collected as a part of the Australian Lithospheric Architecture Magnetotelluric Project (AusLAMP), a decade-long national MT survey jointly coordinated between government and research organisations through the collaboration of AuScope, Geoscience Australia (GA), state and territory geoscience agencies, universities and other research organisations. The AusLAMP project in South Australia was a collaboration between Geological Survey of South Australia (GSSA), the University of Adelaide, Geoscience Australia and AuScope. Level 0 concatenated ASCII time series data from Earth Data Logger instruments located in the Flinders Ranges, South Australia are presented per run. Reference: Department for Energy and Mining, Government of South Australia (2023). EM geophysics, Geological Survey of South Australia (GSSA) website. Available at: https://www.energymining.sa.gov.au/industry/geological-survey/gssa-projects/em-geophysics CreditThe Australian Lithospheric Architecture Magnetotelluric Project (AusLAMP) project in South Australia was a collaboration between Geological Survey of South Australia (GSSA), the University of Adelaide, Geoscience Australia, AuScope and the National Collaborative Research Infrastructure Strategy (NCRIS) (https://www.ga.gov.au/about/projects/resources/auslamp). The Modernising Earth Science Data for High Performance Computing project was enabled by AuScope, the National Computational Infrastructure (NCI Australia) and the Australian Government via the National Collaborative Research Infrastructure Strategy (NCRIS): http://auscope.org.auThis record was harvested by RDA at 2026-08-20T11:58:21.196847+10:00 from NCI's Data Catalogue where it was last modified at 2025-12-23.The MagnetoTellurics time series data publication v2 (MTtsdp_v2: https://doi.org/10.5281/zenodo.20754948 ) codes were used for the generation of the Level 0 concatenated ASCII time series products, which consist of concatenated EX, EY, BX, BY and BZ ASCII files (generated from the raw instrument data) per station per run. No associated metadata are attached to the ASCII files. This dataset is derived from: Magnetotelluric surveys of the Flinders Ranges, South Australia as part of the Australian Lithospheric Architecture Magnetotelluric Project (AusLAMP) (Level 0 concatenated ASCII time series per day; https://dx.doi.org/10.25914/skz8-pq43).&rft.creator=Rees, Nigel &rft.creator=Hollmann, Hannes &rft.creator=Goleby, Bruce &rft.date=2026&rft.edition=v1&rft.coverage=northlimit=-30.55; southlimit=-33.80; westlimit=137.98; eastLimit=140.38&rft.coverage=northlimit=-30.55; southlimit=-33.80; westlimit=137.98; eastLimit=140.38&rft_rights= https://creativecommons.org/licenses/by/4.0/&rft_rights=Creative Commons Attribution 4.0 International&rft_rights=Suggested citation: Rees, N., Hollmann, H. and Goleby, B., 2026, Magnetotelluric surveys of the Flinders Ranges, South Australia as part of the Australian Lithospheric Architecture Magnetotelluric Project (AusLAMP): Level 0 concatenated ASCII time series per run. NCI Australia. https://dx.doi.org/10.25914/9tva-fv38 Accessed on <date>.&rft_subject=geoscientificInformation&rft_subject=magnetotellurics, MT, electrical resistivity, time series, long period, impedance, AusLAMP&rft.type=dataset&rft.language=English Access the data

Licence & Rights:

Open Licence view details
CC-BY

https://creativecommons.org/licenses/by/4.0/

Creative Commons Attribution 4.0 International

Suggested citation: Rees, N., Hollmann, H. and Goleby, B., 2026, Magnetotelluric surveys of the Flinders Ranges, South Australia as part of the Australian Lithospheric Architecture Magnetotelluric Project (AusLAMP): Level 0 concatenated ASCII time series per run. NCI Australia. https://dx.doi.org/10.25914/9tva-fv38 Accessed on .

Access:

Open

Brief description

This record was harvested by RDA at 2026-08-20T11:58:21.196847+10:00 from NCI's Data Catalogue where it was last modified at 2025-12-23.

Full description

Long-period magnetotelluric (MT) time series data that measure natural magnetic and electric field variations at Earth’s surface were collected at various locations throughout the Flinders Ranges, South Australia. This time series dataset was collected as a part of the Australian Lithospheric Architecture Magnetotelluric Project (AusLAMP), a decade-long national MT survey jointly coordinated between government and research organisations through the collaboration of AuScope, Geoscience Australia (GA), state and territory geoscience agencies, universities and other research organisations. The AusLAMP project in South Australia was a collaboration between Geological Survey of South Australia (GSSA), the University of Adelaide, Geoscience Australia and AuScope. Level 0 concatenated ASCII time series data from Earth Data Logger instruments located in the Flinders Ranges, South Australia are presented per run. Reference: Department for Energy and Mining, Government of South Australia (2023). EM geophysics, Geological Survey of South Australia (GSSA) website. Available at: https://www.energymining.sa.gov.au/industry/geological-survey/gssa-projects/em-geophysics

Credit

The Australian Lithospheric Architecture Magnetotelluric Project (AusLAMP) project in South Australia was a collaboration between Geological Survey of South Australia (GSSA), the University of Adelaide, Geoscience Australia, AuScope and the National Collaborative Research Infrastructure Strategy (NCRIS) (https://www.ga.gov.au/about/projects/resources/auslamp).

The Modernising Earth Science Data for High Performance Computing project was enabled by AuScope, the National Computational Infrastructure (NCI Australia) and the Australian Government via the National Collaborative Research Infrastructure Strategy (NCRIS): http://auscope.org.au

Lineage

The MagnetoTellurics time series data publication v2 (MTtsdp_v2: https://doi.org/10.5281/zenodo.20754948 ) codes were used for the generation of the Level 0 concatenated ASCII time series products, which consist of concatenated EX, EY, BX, BY and BZ ASCII files (generated from the raw instrument data) per station per run. No associated metadata are attached to the ASCII files. This dataset is derived from: Magnetotelluric surveys of the Flinders Ranges, South Australia as part of the Australian Lithospheric Architecture Magnetotelluric Project (AusLAMP) (Level 0 concatenated ASCII time series per day; https://dx.doi.org/10.25914/skz8-pq43).

Created: 23 12 2025

Issued: 27 07 2026

Modified: 27 07 2026

Data time period: 2013-09 to 2013-11

This dataset is part of a larger collection

140.38,-30.55 140.38,-33.8 137.98,-33.8 137.98,-30.55 140.38,-30.55

139.18,-32.175

text: northlimit=-30.55; southlimit=-33.80; westlimit=137.98; eastLimit=140.38

Subjects

User Contributed Tags    

Login to tag this record with meaningful keywords to make it easier to discover

ACN 633 798 857