Full description
Water intake cam | enclosing the intake with cement | not clear | Perforated pipe was buried and an intake box built at the point of the existing dam. Later this intake point was enclosed with concrete.. Language as given: Bahinemo Reuse Information
Created: 2007-10-27
Data time period: 2007 to ,
ISO3166: PG
Subjects
User Contributed Tags
Login to tag this record with meaningful keywords to make it easier to discover
Identifiers
- URI : catalog.paradisec.org.au/repository/WD1/P82
- Local : WD1-P82
- DOI : 10.4225/72/56FE8E7DF1EE0
