Data

VPRS 18538 Site and Building Committee

Public Record Office Victoria
Preston Institute of Technology (previously known as Preston Technical School 1937-1964, Preston Technical College 1965- 1967, Preston Institute of Technology 1968-1981)
Viewed: [[ro.stat.viewed]] Cited: [[ro.stat.cited]] Accessed: [[ro.stat.accessed]]
ctx_ver=Z39.88-2004&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Adc&rfr_id=info%3Asid%2FANDS&rft_id=https://prov.vic.gov.au/archive/VPRS18538&rft.title=VPRS 18538 Site and Building Committee&rft.identifier=https://prov.vic.gov.au/archive/VPRS18538&rft.publisher=Public Record Office Victoria&rft.description=This series consists of minute books of the Site & Building Committee from April 1970 to July 1977. There is also a file of correspondence and documents dated 1972 relating to a proposed new engineering tower, and an image of the architect's model of the proposed Bundoora campus development.The Site & Building Committee of the Preston Institute of Technology (VA 1212) was responsible for the major building projects at the Bundoora site. The Committee oversaw the design and construction of the first buildings of the new campus. Initially the committee was simply called the Building Committee, but changed to Site and Building Committee on 21/7/1970. Another name change happened on 24/2/1977 when it became the Capital Projects Committee.&rft.creator=Preston Institute of Technology (previously known as Preston Technical School 1937-1964, Preston Technical College 1965- 1967, Preston Institute of Technology 1968-1981) &rft.date=2021&rft.coverage=141.000000,-34.000000 142.919336,-34.145604 144.582129,-35.659230 147.742627,-35.873175 150.024219,-37.529041 150.200000,-39.200000 141.000000,-39.200000 141.000000,-34.000000 141.000000,-34.000000&rft_subject=HISTORICAL STUDIES&rft_subject=HISTORY AND ARCHAEOLOGY&rft.type=dataset&rft.language=English Access the data

Access:

Open view details

Open

Full description

This series consists of minute books of the Site & Building Committee from April 1970 to July 1977. There is also a file of correspondence and documents dated 1972 relating to a proposed new engineering tower, and an image of the architect's model of the proposed Bundoora campus development.

The Site & Building Committee of the Preston Institute of Technology (VA 1212) was responsible for the major building projects at the Bundoora site. The Committee oversaw the design and construction of the first buildings of the new campus. Initially the committee was simply called the Building Committee, but changed to Site and Building Committee on 21/7/1970. Another name change happened on 24/2/1977 when it became the Capital Projects Committee.

Data time period: [1970 TO 1977]

This dataset is part of a larger collection

141,-34 142.91934,-34.1456 144.58213,-35.65923 147.74263,-35.87318 150.02422,-37.52904 150.2,-39.2 141,-39.2 141,-34

145.6,-36.6

Subjects

User Contributed Tags    

Login to tag this record with meaningful keywords to make it easier to discover