Data

VPRS 18383 Index to Surveys, Plans and Contractors Used in the Construction of Melbourne Underground Rail Loop

Public Record Office Victoria
Melbourne Underground Rail Loop Authority
Viewed: [[ro.stat.viewed]] Cited: [[ro.stat.cited]] Accessed: [[ro.stat.accessed]]
ctx_ver=Z39.88-2004&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Adc&rfr_id=info%3Asid%2FANDS&rft_id=https://prov.vic.gov.au/archive/VPRS18383&rft.title=VPRS 18383 Index to Surveys, Plans and Contractors Used in the Construction of Melbourne Underground Rail Loop&rft.identifier=https://prov.vic.gov.au/archive/VPRS18383&rft.publisher=Public Record Office Victoria&rft.description=The records in this series contain index cards to surveys, plans and contractors used in the construction of the Melbourne underground railway loop.The rail Loop was to be made up of four new rail tracks under Spring and La Trobe Streets (in four separate tunnels, the Burnley, the Caufield/Sandringham, the North Melbourne and Clifton Hill/city circle) forming a new link (a loop) in the existing railway system. Two additional tracks were to be constructed between Flinders Street and Spencer Street Stations as part of the loop with three new underground stations (Parliament, Museum and Flagstaff) to provide the northern and eastern regions of the City with rail connections to the entire suburban network. The Loop runs partly underground (through four tunnels), partly on the surface and partly elevated.&rft.creator=Melbourne Underground Rail Loop Authority &rft.date=2021&rft.coverage=141.000000,-34.000000 142.919336,-34.145604 144.582129,-35.659230 147.742627,-35.873175 150.024219,-37.529041 150.200000,-39.200000 141.000000,-39.200000 141.000000,-34.000000 141.000000,-34.000000&rft_subject=HISTORICAL STUDIES&rft_subject=HISTORY AND ARCHAEOLOGY&rft.type=dataset&rft.language=English Access the data

Access:

Open view details

Open

Full description

The records in this series contain index cards to surveys, plans and contractors used in the construction of the Melbourne underground railway loop.

The rail Loop was to be made up of four new rail tracks under Spring and La Trobe Streets (in four separate tunnels, the Burnley, the Caufield/Sandringham, the North Melbourne and Clifton Hill/city circle) forming a new link (a loop) in the existing railway system. Two additional tracks were to be constructed between Flinders Street and Spencer Street Stations as part of the loop with three new underground stations (Parliament, Museum and Flagstaff) to provide the northern and eastern regions of the City with rail connections to the entire suburban network. The Loop runs partly underground (through four tunnels), partly on the surface and partly elevated.

Data time period: [1960 TO 1980]

This dataset is part of a larger collection

Click to explore relationships graph

141,-34 142.91934,-34.1456 144.58213,-35.65923 147.74263,-35.87318 150.02422,-37.52904 150.2,-39.2 141,-39.2 141,-34

145.6,-36.6

Subjects

User Contributed Tags    

Login to tag this record with meaningful keywords to make it easier to discover

ACN 633 798 857