Brief description
A summation of survey tasks conducted within the Davis Station surrounds is as follows:• Priority 1 – Wharf Area: Feature survey of a designated area surrounding the Davis wharf at a 10m grid spacing. However, due to the small area of the wharf, a 10m external buffer was applied to ensure there are no data gaps on completion of the survey and a 5m natural surface grid was collected including all services that were joined or contained within the region.
• Priority 2 – Feature survey of a designated area to the North East of the Bureau of Meteorology and General Science buildings. A region approximately 150m x 380m. A detailed pickup of the existing electrical, optic fiber, telecommunication lines, high frequency radio mast and guide wires were collected including the location of the BoM instruments. Natural surface collection was collected at a 10m grid spacing.
Issued: 2021-04-06
Data time period: 2019-01-31 to 2019-02-07
text: northlimit=-68.575111; southlimit=-68.583684; westlimit=77.944345; eastLimit=77.967844; projection=WGS84
User Contributed Tags
Login to tag this record with meaningful keywords to make it easier to discover
AU-ANL:PEAU :
http://nla.gov.au/nla.party-617536
- global : 2b7dbda7-b967-43f9-8e42-e0f6c8638203
- DOI : 10.26179/ktpy-zx90
- Local : HI621B_Davis_Station_Survey
- URI : https://data.aad.gov.au/metadata/records/HI621B_Davis_Station_Survey
- URI : https://data.aad.gov.au/metadata/records/HI621B_Davis_Station_Survey