Full description
Survey summary of works during surveying fieldwork at Mawson Station 24 – 30 January 2025 as part of round trip Voyage 2 for Project 5202.Surveys conducted:
• Audit of survey control within extended station limits.
• RPA (drone) lidar and imagery data capture for station limits and station extents.
• Survey location of building footprints and infrastructure including new bollard.
• Terrestrial laser scanning of tankhouse, old science “wombat” building, waste water treatment building and under mechanical workshop. Scanning was prioritised by infrastructure objectives.
• Survey equipment installed on station, storage location confirmed and battery management programme initiated.
Lineage
Progress Code: completedData time period: 2025-01-24 to 2025-01-30
text: westlimit=62.38574; southlimit=-68.12595; eastlimit=63.38574; northlimit=-67.12595
User Contributed Tags
Login to tag this record with meaningful keywords to make it easier to discover
Download the dataset. (GET DATA > DIRECT DOWNLOAD)
url :
https://data.aad.gov.au/eds/6108/download![]()
Citation reference for this metadata record and dataset. (VIEW RELATED INFORMATION)
url :
https://data.aad.gov.au/aadc/metadata/citation.cfm?entry_id=AAS_5202_survey_2024-2025_mawson![]()
- global : AAS_5202_survey_2024-2025_mawson