Full description
Survey summary of works completed during surveying fieldwork at Davis station 30 October – 5 November 2025 as part of round-trip Voyage 1 for Project 5202.Surveys conducted:
• Audit of survey control within station and extended station limits. Confirmed, surveyed and photographed control to inform survey control database. D37, D38, D22, HBM1, and HBM2
• Underground cable location of power and comms between aviation building and sea level monitoring mast
• Assessment of locations for trapezoidal corner reflector, survey of three potential sites
• Terrestrial laser scans station infrastructure: - hangar and helihuts external and internal, meteorological building internal and external, science building external, SMQ (sleeping and medical quarters) external and internal, Living quarters, mess, internal and external.
• Survey equipment inventory
• Appraisal of remaining terrestrial laser scanning of station infrastructure
Lineage
Progress Code: completedNotes
PurposeData resulting from survey fieldwork activities at Davis station as part of AAS 5202 - Australian Antarctic Mapping Program
Data time period: 2025-10-01 to 2025-11-30
text: westlimit=77.48096; southlimit=-69.09249; eastlimit=78.48096; northlimit=-68.09249
User Contributed Tags
Login to tag this record with meaningful keywords to make it easier to discover
Download data (GET DATA > DIRECT DOWNLOAD)
url :
https://data.aad.gov.au/eds/6167/download![]()
Public information for AAS project 5202 (PROJECT HOME PAGE)
url :
https://projects.aad.gov.au/report_project_public.cfm?project_no=5202![]()
Citation reference for this metadata record and dataset. (VIEW RELATED INFORMATION)
url :
https://data.aad.gov.au/aadc/metadata/citation.cfm?entry_id=AAS_5202_Survey_2025-2026_Davis![]()
- global : AAS_5202_Survey_2025-2026_Davis