Full description
Survey summary of works during surveying fieldwork at Casey Station 22 December 2024 – 4 January 2025 as part of round trip Voyage 2 for Project 5202.Surveys conducted:
• Completed audit of survey control within extended station limits. Surveyed existing ground control – confirmed more survey control near wharf (additional to 2023/2024 Survey)
• RPA (drone) lidar and imagery capture of station and extents.
• Terrestrial laser scans of station infrastructure
o Tank house,
o container medical facility,
o old waste water treatment building,
o outside scan of upper station, as a skeleton survey for further internal scans. These scans compliment previous work conducted in 2023/2024 season.
• Survey of proposed new mast location options in ASPA 135
• Survey equipment installed on station, storage location confirmed and battery management programme initiated.
Data summary:
2025 Casey station survey report document
AUSPOS - RINEX and Geoscience Australia GPS Processing Reports of static observations
CAD file - 20250123 Casey Survey ITRF2000 UTMZ49S MSL.dwg (autocad format)
Photographs - jpg format for clarity of ASPA135, survey control, surveying equipment, and terrestrial laser scanning
Point Listing- casey survey points ITRF 2000 UTMZ49S MSL csv format
Lineage
Progress Code: completedData time period: 2024-12-22 to 2025-01-04
text: westlimit=110.01709; southlimit=-66.54389; eastlimit=111; northlimit=-66
User Contributed Tags
Login to tag this record with meaningful keywords to make it easier to discover
Download the dataset. (GET DATA > DIRECT DOWNLOAD)
url :
https://data.aad.gov.au/eds/6106/download![]()
Citation reference for this metadata record and dataset. (VIEW RELATED INFORMATION)
url :
https://data.aad.gov.au/aadc/metadata/citation.cfm?entry_id=AAS_5202_survey_2024-2025_casey![]()
- DOI : 10.26179/R1FA-YP57
- global : AAS_5202_survey_2024-2025_casey