Taken from sections of the report:Introduction
The 2000/2001 Antarctic Geodesy Summer Program consisted of a number of distinct components. They included:
- ARGN reference mark surveys at Mawson and Davis.
- Orthometric height connections between the Mawson ARGN site (AUS064) and the Mawson TGBM (AUS258).
- Orthometric height connections between the Davis ARGN site (AUS099) and the Davis TGBM (AUS186).
- Connection by GPS to the Tide Gauge Benchmarks at Mawson, Davis and Larsemann Hills.
- Strengthen the Australian Antarctic Geodetic Network with GPS observations where possible.
- Establish a permanent Australian monument and connection to existing Chinese monuments in the Grove Mountains.
- Connect to Russian and Chinese Geodetic control points in the Larsemann Hills vicinity for datum unification.
- Derive ellipsoidal heights for lake benchmarks in the Vestfold Hills for the purpose of developing a geometric geoid model for that area.
The following report details the work completed in the 2000/2001 summer season, bu AUSLIG (Now Geoscience Australia) geodetic surveyors, Gary Johnston and Paul Digney between November 2000 and March 2001.
Issued: 2007-01-17
Data time period: 2000-11-20 to 2001-03-31
text: northlimit=-66.0; southlimit=-70.0; westlimit=60.0; eastLimit=80.0; projection=WGS84
User Contributed Tags
Login to tag this record with meaningful keywords to make it easier to discover
AU-ANL:PEAU :
http://nla.gov.au/nla.party-617536
- global : ecdb29de-a6d4-46ea-8ceb-90bdbd1c44bd
- Local : survey_2000-01_auslig
- URI : https://data.aad.gov.au/metadata/records/survey_2000-01_auslig
- URI : https://data.aad.gov.au/metadata/records/survey_2000-01_auslig