Data

Proposed bus turnaround facility, Westmead Precinct, Northwest Transitways: review of environmental factors

data.nsw.gov.au
Viewed: [[ro.stat.viewed]] Cited: [[ro.stat.cited]] Accessed: [[ro.stat.accessed]]
ctx_ver=Z39.88-2004&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Adc&rfr_id=info%3Asid%2FANDS&rft_id=http://data.nsw.gov.au/data/dataset/3-16681-proposed-bus-turnaround-facility--westmead-precinct--northwest-transitways--review-of-enviro&rft.title=Proposed bus turnaround facility, Westmead Precinct, Northwest Transitways: review of environmental factors&rft.identifier=http://data.nsw.gov.au/data/dataset/3-16681-proposed-bus-turnaround-facility--westmead-precinct--northwest-transitways--review-of-enviro&rft.publisher=data.nsw.gov.au&rft.description=The New South Wales Roads and Traffic Authority (RTA) proposes to construct a bus turnaround facility off Darcy Road in the Westmead precinct of the Northwest Transitways. The RTA, in partnership with the Ministry of Transport (MoT) is constructing and operating the North-West Transitway Network, consisting of two integrated rapid bus links: Parramatta — Rouse Hill Link and Blacktown — Castle Hill Link. The Transitway consists of new bus only roadways and the creation of dedicated bus lanes on existing roads. The Parramatta — Rouse Hill Link will be approximately 17 kilometres (km) long and include 19 Transitway stations. The Blacktown — Castle Hill Link will be approximately 15 km long and include 21 Transitway stations (including Burns interchange).&rft.creator=Anonymous&rft.date=2026&rft_rights=Licence Specified by Agency&rft_subject=Roads and Traffic Authority of New South Wales&rft_subject=northwest transitway&rft_subject=transitway&rft_subject=westmead&rft.type=dataset&rft.language=English Access the data

Licence & Rights:

Other view details
Lsba

Licence Specified by Agency

Brief description

The New South Wales Roads and Traffic Authority (RTA) proposes to construct a bus turnaround facility off Darcy Road in the Westmead precinct of the Northwest Transitways. The RTA, in partnership with the Ministry of Transport (MoT) is constructing and operating the North-West Transitway Network, consisting of two integrated rapid bus links: Parramatta — Rouse Hill Link and Blacktown — Castle Hill Link. The Transitway consists of new bus only roadways and the creation of dedicated bus lanes on existing roads. The Parramatta — Rouse Hill Link will be approximately 17 kilometres (km) long and include 19 Transitway stations. The Blacktown — Castle Hill Link will be approximately 15 km long and include 21 Transitway stations (including Burns interchange).
Subjects

User Contributed Tags    

Login to tag this record with meaningful keywords to make it easier to discover

Other Information
ACN 633 798 857