Brief description
The aim of this proposal is to carry out tests of the new backend instruments which cannot be carried out during standard maintenance periods. The scheduled time is used to measure beam shapes, determine polarisation calibration solutions and commission the National Facility observing modes for the new wide-band receiver.Available: 2019-05-30
Data time period: 2019-04-01 to 2019-09-30
Subjects
Astronomical Sciences |
Astronomical Sciences Not Elsewhere Classified |
P737_2019APRS |
Physical Sciences |
neutron stars |
pulsars |
User Contributed Tags
Login to tag this record with meaningful keywords to make it easier to discover
Identifiers
- DOI : 10.25919/5CEF0B898AAB1
- Local : 102.100.100/131343