Data

Orange Ultimate Flood Modification Scheme Phase A

data.nsw.gov.au
Orange City Council (Owner)
Viewed: [[ro.stat.viewed]] Cited: [[ro.stat.cited]] Accessed: [[ro.stat.accessed]]
ctx_ver=Z39.88-2004&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Adc&rfr_id=info%3Asid%2FANDS&rft_id=http://data.nsw.gov.au/data/dataset/fdp-orange-ultimate-flood-modification-scheme-phase-a&rft.title=Orange Ultimate Flood Modification Scheme Phase A&rft.identifier=http://data.nsw.gov.au/data/dataset/fdp-orange-ultimate-flood-modification-scheme-phase-a&rft.publisher=data.nsw.gov.au&rft.description=The Orange Ultimate Flood Modification Scheme: Feasibility & Design Project – Phase A: ARR19 Update MemorandumPhase A comprised an update of the existing DRAINS and TUFLOW flood modelling (developed as part of \r\nthe Blackmans Swamp Creek and Ploughmans Creek Floodplain Risk Management Study & Plan) for the 1% \r\nAEP event from Australian Rainfall & Runoff (ARR) 1987 to ARR 2019 methodology.&rft.creator=Anonymous&rft.date=2024&rft.coverage=New South Wales (NSW81093)&rft_rights=Licence Specified by Agency&rft.type=dataset&rft.language=English Access the data

Licence & Rights:

Other view details
Lsba

Licence Specified by Agency

Contact Information



Brief description

Phase A comprised an update of the existing DRAINS and TUFLOW flood modelling (developed as part of
the Blackmans Swamp Creek and Ploughmans Creek Floodplain Risk Management Study & Plan) for the 1%
AEP event from Australian Rainfall & Runoff (ARR) 1987 to ARR 2019 methodology.

Full description

The Orange Ultimate Flood Modification Scheme: Feasibility & Design Project – Phase A: ARR19 Update Memorandum

This dataset is part of a larger collection

Click to explore relationships graph

Spatial Coverage And Location

text: New South Wales (NSW81093)

User Contributed Tags    

Login to tag this record with meaningful keywords to make it easier to discover

Identifiers