Data

Moorebank interchange: review of environmental factors: volume 2 - appendices

data.nsw.gov.au
Viewed: [[ro.stat.viewed]] Cited: [[ro.stat.cited]] Accessed: [[ro.stat.accessed]]
ctx_ver=Z39.88-2004&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Adc&rfr_id=info%3Asid%2FANDS&rft_id=http://data.nsw.gov.au/data/dataset/3-16613-moorebank-interchange--review-of-environmental-factors--volume-2---appendices&rft.title=Moorebank interchange: review of environmental factors: volume 2 - appendices&rft.identifier=http://data.nsw.gov.au/data/dataset/3-16613-moorebank-interchange--review-of-environmental-factors--volume-2---appendices&rft.publisher=data.nsw.gov.au&rft.description=The Moorebank interchange is located on the M5 Motorway at Moorebank between the eastern end of the Georges River Bridge and Heathcote Road. These appendices support the report that was prepared to asses and facilitate the management of any potential impacts on the environment from the proposed activities. The proposed activities involve the construction and operation of the interchange which will replace the existing interchange at the grade traffic signal controlled intersection. It also includes consideration of the interchange's east facing ramps which will facilitate merging and minimise weaving between the Moorebank interchange and the existing Heathcote interchange.&rft.creator=Anonymous&rft.date=2026&rft_rights=Licence Specified by Agency&rft_subject=Roads and Traffic Authority of New South Wales&rft_subject=bridge&rft_subject=georges river&rft_subject=m5 motorway&rft_subject=moorebank&rft.type=dataset&rft.language=English Access the data

Licence & Rights:

Other view details
Lsba

Licence Specified by Agency

Brief description

The Moorebank interchange is located on the M5 Motorway at Moorebank between the eastern end of the Georges River Bridge and Heathcote Road. These appendices support the report that was prepared to asses and facilitate the management of any potential impacts on the environment from the proposed activities. The proposed activities involve the construction and operation of the interchange which will replace the existing interchange at the grade traffic signal controlled intersection. It also includes consideration of the interchange's east facing ramps which will facilitate merging and minimise weaving between the Moorebank interchange and the existing Heathcote interchange.
Subjects

User Contributed Tags    

Login to tag this record with meaningful keywords to make it easier to discover

Other Information
ACN 633 798 857