Data

Mining Footprints Glencore Xstrata Bulga Pilot 20150203

data.gov.au
Bioregional Assessment Program (Owned by)
Viewed: [[ro.stat.viewed]] Cited: [[ro.stat.cited]] Accessed: [[ro.stat.accessed]]
ctx_ver=Z39.88-2004&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Adc&rfr_id=info%3Asid%2FANDS&rft_id=http://data.gov.au/data/dataset/eab8bbd9-6bc7-422c-b6e2-6081cc854b05&rft.title=Mining Footprints Glencore Xstrata Bulga Pilot 20150203&rft.identifier=e1e997b4-4f49-40c5-b930-26b87683f71f&rft.publisher=data.gov.au&rft.description=## **Abstract** \n\nThis data and its metadata statement were supplied to the Bioregional Assessment Programme by a third party and are represented here as originally supplied:\n\n\n\n\\*Glencore have committed to assisting the DoW with their Bioregional Assessment Program.\n\n\\*This assistance involves the provision of 'Mined Out' surfaces and polygons for both Underground and Open Cut operations across the business.\n\n\\*The Bulga Complex was nominated as the pilot site, and the nature of the data provided for the Bulga Complex has been detailed in this presentation.\n\n\\*The Bulga complex is made up of both underground and surface operations. \n\n\\*The Underground operations extract coal using longwall methods, and target 5 primary seam horizons: Whybrow, Blakefield, Glen Munro, and Woodlands Hill.\n\n\\*The Bulga Open Cut reserves are spilt into 2 broad categories, current approved mining reserves (Main and Bayswater Pits), and Bulga Optimisation Project (BOP) reserves (East and East Extension Pits).\n\n\n\nThis dataset has been provided to the BA Programme for use within the programme only. Third parties should contact Glencore. http://www.glencore.com/.\n\n## **Dataset History** \n\nThis data and its metadata statement were supplied to the Bioregional Assessment Programme by a third party and are represented here as originally supplied:\n\n\n\nPlease see power point presentation included in Data folder:\n\n\n\nThe data has been provided at the following:\t\t\n\n1.Full Life of Mine Plans for both OC & UG at 5 yearly increments\t\t\n\n»Year End 2012 (this is Actual data)\t\t\n\n»Year End 2017\t\t\n\n»Year End 2022\t\t\n\n»Year End 2027, etc. at 5 year increments until end LOM\t\t\n\n»Only the relevant data for each time period has been provided. \t\t\n\n»Please note that LOM plans are conceptual. Variations may occur as the LOM plans are reviewed (annually).\t\t\n\n2.Currently approved mine plans:\t\t\n\n»For Bulga OC, the 2015 surface represents the completion of Main Pit\t\t\n\n»For Bulga UG, all surfaces provided represent the currently approved Mine Plan (Blakefield, Glen Munro and Woodlands Hill Seams)\n\n\n\nMined Out' polygons by mining horizon:\n\nWhybrow (South Bulga & Beltana Mines)\n\nBUG_WHY_2012_Mined Out.Dwg\n\nNB: Extraction from the Whybrow seam was completed in April 2011\n\nBlakefield\n\nBUG_BLK_2017_Mined Out.dwg\n\nBUG_BLK_2022_Mined Out.dwg\n\nBUG_BLK_2027_Mined Out.dwg\n\nGlen Munro\n\nBUG_GMUN_2027_mined Out.dwg\n\nBUG_GMUN_2032_Mined Out.dwg\n\nBUG_GMUN_2037_Mined Out.dwg\n\nWoodlands Hill\n\nBUG_WHILL_2027_Mined Out.dwg\n\nBUG_WHILL_2032_Mined Out.dwg\n\nBUG_WHILL_2037_Mined Out.dwg\n\n\n\nAll polygons have been fitted to the mining horizon grids.\n\n## **Dataset Citation** \n\nGlencore Xstrata (2015) Mining Footprints Glencore Xstrata Bulga Pilot 20150203. Bioregional Assessment Source Dataset. Viewed 22 June 2018, http://data.bioregionalassessments.gov.au/dataset/e1e997b4-4f49-40c5-b930-26b87683f71f.&rft.creator=Bioregional Assessment Program&rft.date=2023&rft.coverage=POLYGON ((0 0, 0 0, 0 0, 0 0))&rft_rights=Limited access. Requests to the Bioregional Assesment Programme http://www.bioregionalassessments.gov.au/data&rft_subject=Australia&rft_subject=Hunter subregion&rft_subject=INDUSTRY-Mining&rft_subject=economy&rft.type=dataset&rft.language=English Access the data

Licence & Rights:

Other view details
Limited-access.-requests-to-the-bioregional-assesment-programme-http://www.bioregionalassessments.gov.au/data

Limited access. Requests to the Bioregional Assesment Programme http://www.bioregionalassessments.gov.au/data

Brief description

## **Abstract**

This data and its metadata statement were supplied to the Bioregional Assessment Programme by a third party and are represented here as originally supplied:



\\*Glencore have committed to assisting the DoW with their Bioregional Assessment Program.

\\*This assistance involves the provision of 'Mined Out' surfaces and polygons for both Underground and Open Cut operations across the business.

\\*The Bulga Complex was nominated as the pilot site, and the nature of the data provided for the Bulga Complex has been detailed in this presentation.

\\*The Bulga complex is made up of both underground and surface operations.

\\*The Underground operations extract coal using longwall methods, and target 5 primary seam horizons: Whybrow, Blakefield, Glen Munro, and Woodlands Hill.

\\*The Bulga Open Cut reserves are spilt into 2 broad categories, current approved mining reserves (Main and Bayswater Pits), and Bulga Optimisation Project (BOP) reserves (East and East Extension Pits).



This dataset has been provided to the BA Programme for use within the programme only. Third parties should contact Glencore. http://www.glencore.com/.

## **Dataset History**

This data and its metadata statement were supplied to the Bioregional Assessment Programme by a third party and are represented here as originally supplied:



Please see power point presentation included in Data folder:



The data has been provided at the following:\t\t

1.Full Life of Mine Plans for both OC & UG at 5 yearly increments\t\t

»Year End 2012 (this is Actual data)\t\t

»Year End 2017\t\t

»Year End 2022\t\t

»Year End 2027, etc. at 5 year increments until end LOM\t\t

»Only the relevant data for each time period has been provided. \t\t

»Please note that LOM plans are conceptual. Variations may occur as the LOM plans are reviewed (annually).\t\t

2.Currently approved mine plans:\t\t

»For Bulga OC, the 2015 surface represents the completion of Main Pit\t\t

»For Bulga UG, all surfaces provided represent the currently approved Mine Plan (Blakefield, Glen Munro and Woodlands Hill Seams)



Mined Out' polygons by mining horizon:

Whybrow (South Bulga & Beltana Mines)

BUG_WHY_2012_Mined Out.Dwg

NB: Extraction from the Whybrow seam was completed in April 2011

Blakefield

BUG_BLK_2017_Mined Out.dwg

BUG_BLK_2022_Mined Out.dwg

BUG_BLK_2027_Mined Out.dwg

Glen Munro

BUG_GMUN_2027_mined Out.dwg

BUG_GMUN_2032_Mined Out.dwg

BUG_GMUN_2037_Mined Out.dwg

Woodlands Hill

BUG_WHILL_2027_Mined Out.dwg

BUG_WHILL_2032_Mined Out.dwg

BUG_WHILL_2037_Mined Out.dwg



All polygons have been fitted to the mining horizon grids.

## **Dataset Citation**

Glencore Xstrata (2015) Mining Footprints Glencore Xstrata Bulga Pilot 20150203. Bioregional Assessment Source Dataset. Viewed 22 June 2018, http://data.bioregionalassessments.gov.au/dataset/e1e997b4-4f49-40c5-b930-26b87683f71f.

This dataset is part of a larger collection

Click to explore relationships graph

Spatial Coverage And Location

text: POLYGON ((0 0, 0 0, 0 0, 0 0))

Subjects

User Contributed Tags    

Login to tag this record with meaningful keywords to make it easier to discover

Identifiers