Brief description
All design events and durations were modelled. To achieve this, some alteration of the pipe schematisation and pipe roughness was required in places to improve the stability of the model. These changes were minor, particularly in the context of a 1% AEP event, however improved the stability of the model runs.Full description
Manly Lagoon FRMSP GIS DataSpatial Coverage And Location
text: New South Wales (NSW81093)
Subjects
User Contributed Tags
Login to tag this record with meaningful keywords to make it easier to discover
Identifiers
- URI : data.nsw.gov.au/data/dataset/fdp-manly-lagoon-frmsp-gis
- Local : 1ca3c910-428e-4d70-8ffc-c2a55c4364bf