Data

Lake Macquarie - Floodplain Management Plan August 2001

data.nsw.gov.au
Viewed: [[ro.stat.viewed]] Cited: [[ro.stat.cited]] Accessed: [[ro.stat.accessed]]
ctx_ver=Z39.88-2004&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Adc&rfr_id=info%3Asid%2FANDS&rft_id=http://data.nsw.gov.au/data/dataset/fdp-lake-macquarie-floodplain-management-plan-august-2001-report&rft.title=Lake Macquarie - Floodplain Management Plan August 2001&rft.identifier=http://data.nsw.gov.au/data/dataset/fdp-lake-macquarie-floodplain-management-plan-august-2001-report&rft.publisher=data.nsw.gov.au&rft.description=Lake Macquarie - Floodplain Management Plan August 2001Lake Macquarie - Floodplain Management Plan FiguresFloodplain Management Plan Report and figures.\r\n\r\nThis Plan provides the basis for the future management of flood liable lands adjacent to the\r\nlake in the Lake Macquarie City Council area. The Plan was developed from the Lake\r\nMacquarie Flood Study (Part 1 - January 1998 and Part 2 - April 1998) and the Lake\r\nMacquarie Floodplain Management Study (August 2000).\r\n\r\nThe Lake Macquarie Flood Study determined design flood levels for the 1%, 2% and 5% AEP\r\nfloods and an Extreme flood event. It examined the still water level and also the effect of wave\r\nrunup along the foreshore.\r\nThe design events represent floods which have a certain probability of occurrence. The\r\n“1% AEP” or “1 in 100 flood has a 1 in 100 chance of being equalled or exceeded in any year.\r\nOn a LONG TERM average it will happen once in every 100 years, but it is wrong to think it\r\ncan only happen once in a century. Because floods are random events there is still a 1 in 100\r\nchance of such a flood occurring next year no matter what happens this year.&rft.creator=Anonymous&rft.date=2024&rft.coverage=New South Wales (NSW81093)&rft_rights=Licence Specified by Agency&rft_subject=Lake Macquarie&rft.type=dataset&rft.language=English Access the data

Licence & Rights:

Other view details
Lsba

Licence Specified by Agency

Brief description

Floodplain Management Plan Report and figures.

This Plan provides the basis for the future management of flood liable lands adjacent to the
lake in the Lake Macquarie City Council area. The Plan was developed from the Lake
Macquarie Flood Study (Part 1 - January 1998 and Part 2 - April 1998) and the Lake
Macquarie Floodplain Management Study (August 2000).

The Lake Macquarie Flood Study determined design flood levels for the 1%, 2% and 5% AEP
floods and an Extreme flood event. It examined the still water level and also the effect of wave
runup along the foreshore.
The design events represent floods which have a certain probability of occurrence. The
“1% AEP” or “1 in 100" flood has a 1 in 100 chance of being equalled or exceeded in any year.
On a LONG TERM average it will happen once in every 100 years, but it is wrong to think it
can only happen once in a century. Because floods are random events there is still a 1 in 100
chance of such a flood occurring next year no matter what happens this year.

Full description

Lake Macquarie - Floodplain Management Plan August 2001
Lake Macquarie - Floodplain Management Plan Figures

Spatial Coverage And Location

text: New South Wales (NSW81093)

Subjects

User Contributed Tags    

Login to tag this record with meaningful keywords to make it easier to discover

Identifiers