ctx_ver=Z39.88-2004&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Adc&rfr_id=info%3Asid%2FANDS&rft_id=http://data.nsw.gov.au/data/dataset/fdp-haslam-creek-flood-study-report&rft.title=Haslams Creek Flood Study&rft.identifier=http://data.nsw.gov.au/data/dataset/fdp-haslam-creek-flood-study-report&rft.publisher=data.nsw.gov.au&rft.description=Haslams Creek - Flood Study#THE STUDY AREA\r\nHaslams Creek drains a catchment area of about 17km2 in the Auburn Council Local\r\nGovernment Area. Figure 1 defines the catchment and the major drainage branches\r\nwhile all the modelled drainage branches are shown in greater detail in Figure 8.\r\n\r\nLand use within the catchment is mostly residential with pockets of industrial and\r\ncommercial land use while the south-eastern portion of the catchment also includes a\r\nportion of the Rockwood Cemetery.\r\n\r\nThe main creek is a concrete lined channel upstream of Parramatta Road but has an\r\nunlined invert and lined banks between Parramatta Road and the M4 Motorway. The\r\ncreek channel downstream of the M4 Motorway has recently been reconstructed as part\r\nof the Olympic Village development. This flood study is only concerned with the portion\r\nof the catchment upstream of the M4 Motorway.\r\n\r\nThe trunk drainage system for the catchment includes various stormwater channels and\r\npipe networks which discharge into Haslams Creek. The various tributary stormwater\r\nchannels are all lined. There are numerous structures along the length of the channels,\r\nmainly road and rail crossings, but there are also some instances of residential and\r\nindustrial developments spanning the channels.\r\n\r\nThe extent of trunk drainage system analysis was defined in the Study brief (see\r\nAppendix A) and is also summarised in Table 1. Some parts of the trunk drainage\r\nsystem, including Haslams Creek, are under the control of Sydney Water while other parts\r\nof the system are under the control of Auburn Council, as also summarised in Table 1.\r\n\r\nOverbank flooding of the open channel systems and surcharging of the pipe drainage\r\nsystems have occurred during large rainfall events, such as those occurring in November\r\n1961, August 1986 and January 1996. Areas of the catchment which have experienced\r\nproblems in the past include:\r\n\r\n* Vivian Crescent, which is drained by a small capacity pipe, and also experiences\r\noverland flow from the Railway Culverts Sub-Branch and from Campbell St;\r\n* Bachell Street, Delhi Street and between Simla Street and Parramatta Road on the\r\nArthur Street Branch;\r\n* between James Street and East Street on the Joseph Street Branch;\r\n* Frederick Street and Sweet Street (upstream of the Motor Registry) on the Church\r\nStreet Branch;\r\n* between Dartbrook Road and Holliday Lane on the St Hilliers Road Branch; and\r\n* between Harrow Road and Dudley Street on the Auburn Heights Branch.\r\n\r\n#REASONS FOR STUDY\r\nWhile there has been occasions of overflow of the trunk drainage systems and associated \r\ninundation of adjoining lands the extent of such inundation may be substantially greater\r\nduring large storm events. Therefore Council required a study to define such flood\r\nbehaviour to use as a basis for floodplain management.\r\n\r\nVarious studies to derive design flood levels and discharges for certain parts of the\r\ncatchment have been undertaken but there were some inconsistencies in the results of\r\nthese studies. Council therefore commissioned a review of those studies. The resulting\r\n1996 Bewsher Consulting Review of Haslams Creek Flood Studies report (Reference 1)\r\nreviewed all of the previous flood studies for Haslams Creek and found that:\r\n\r\n* a large number of flood investigations had been completed within the study area.\r\nThose studies utilised various hydrologic and hydraulic models, various ground\r\nsurvey data, various modelling assumptions (e.g. extent of flood storage), various\r\nassumptions concerning modelling of hydraulic structures, various techniques for\r\nmodel calibration and verification, various assumptions concerning development\r\nconditions within the catchment, etc. The geographical coverage of each study was\r\nalso different in most cases;\r\n* given the nature of the Haslams Creek catchment, the models adopted for a flood\r\nstudy or floodplain management study needed to be able to simulate:\r\n(1)channel storage and floodplain storage adjacent to the existing channel system,\r\nespecially upstream of the numerous railway and road crossings;\r\n(2) affluxes at road and railway structures;\r\n(3) a mixture of subcritical and supercritical flow, including hydraulic jumps;\r\n(4) secondary overland flowpaths;\r\n(5) pipe system capacities, pit losses and flow in pipes with submerged outlets;\r\n* none of the previous studies had adequately modelled all of these aspects. Most of\r\nthe previous studies had a limited geographical coverage. Also a number of small\r\nchanges have occurred in the catchment and the channel systems since the studies\r\nwere completed.\r\n\r\nConsequently, the study recommended that a new flood study be undertaken for the\r\nbranches upstream of the M4 Motorway.\r\n\r\nThe report included recommendations regarding hydrologic and hydraulic modelling. That\r\nis, a combination of RAFTS and ILSAX models were deemed suitable for the hydrologic\r\nmodelling of the open channels and piped systems respectively and a combination of\r\nMIKE-11 and/or HEC-RAS models were considered suitable for the hydraulic modelling\r\nof the open channels with hydraulic gradeline analyses of each pipe drainage system.\r\n\r\nThe methodology adopted for this report is consistent with those recommendations and\r\nis detailed in Section 4.\r\nIn accordance with Council's study brief (reference Appendix A) this report provides\r\nestimates of:\r\n\r\n* design discharges for both the open channel and piped drainage systems for 5, 20\r\nand 100 year average recurrence interval (ARI) and probable maximum flood (PMF)\r\nevents;\r\n* design flood levels, energy levels and velocities along the open channel system for\r\nthe 5, 20 ~nd 100 year ARI and PMF events;\r\n* hydraulic and hazard categories for areas subject to overbank flooding; and\r\n* the capacity of the trunk pipe drainage system, the overland flow discharge and the \r\napproximate depth of overland flow.&rft.creator=Anonymous&rft.date=2024&rft.coverage=New South Wales (NSW81093)&rft_rights=Licence Specified by Agency&rft_subject=Haslams Creek&rft_subject=hydraulic model&rft_subject=hydrologic model&rft.type=dataset&rft.language=English Access the data

Licence & Rights:

Other view details
Lsba

Licence Specified by Agency

Brief description

#THE STUDY AREA
Haslams Creek drains a catchment area of about 17km2 in the Auburn Council Local
Government Area. Figure 1 defines the catchment and the major drainage branches
while all the modelled drainage branches are shown in greater detail in Figure 8.

Land use within the catchment is mostly residential with pockets of industrial and
commercial land use while the south-eastern portion of the catchment also includes a
portion of the Rockwood Cemetery.

The main creek is a concrete lined channel upstream of Parramatta Road but has an
unlined invert and lined banks between Parramatta Road and the M4 Motorway. The
creek channel downstream of the M4 Motorway has recently been reconstructed as part
of the Olympic Village development. This flood study is only concerned with the portion
of the catchment upstream of the M4 Motorway.

The trunk drainage system for the catchment includes various stormwater channels and
pipe networks which discharge into Haslams Creek. The various tributary stormwater
channels are all lined. There are numerous structures along the length of the channels,
mainly road and rail crossings, but there are also some instances of residential and
industrial developments spanning the channels.

The extent of trunk drainage system analysis was defined in the Study brief (see
Appendix A) and is also summarised in Table 1. Some parts of the trunk drainage
system, including Haslams Creek, are under the control of Sydney Water while other parts
of the system are under the control of Auburn Council, as also summarised in Table 1.

Overbank flooding of the open channel systems and surcharging of the pipe drainage
systems have occurred during large rainfall events, such as those occurring in November
1961, August 1986 and January 1996. Areas of the catchment which have experienced
problems in the past include:

* Vivian Crescent, which is drained by a small capacity pipe, and also experiences
overland flow from the Railway Culverts Sub-Branch and from Campbell St;
* Bachell Street, Delhi Street and between Simla Street and Parramatta Road on the
Arthur Street Branch;
* between James Street and East Street on the Joseph Street Branch;
* Frederick Street and Sweet Street (upstream of the Motor Registry) on the Church
Street Branch;
* between Dartbrook Road and Holliday Lane on the St Hilliers Road Branch; and
* between Harrow Road and Dudley Street on the Auburn Heights Branch.

#REASONS FOR STUDY
While there has been occasions of overflow of the trunk drainage systems and associated
inundation of adjoining lands the extent of such inundation may be substantially greater
during large storm events. Therefore Council required a study to define such flood
behaviour to use as a basis for floodplain management.

Various studies to derive design flood levels and discharges for certain parts of the
catchment have been undertaken but there were some inconsistencies in the results of
these studies. Council therefore commissioned a review of those studies. The resulting
1996 Bewsher Consulting Review of Haslams Creek Flood Studies report (Reference 1)
reviewed all of the previous flood studies for Haslams Creek and found that:

* a large number of flood investigations had been completed within the study area.
Those studies utilised various hydrologic and hydraulic models, various ground
survey data, various modelling assumptions (e.g. extent of flood storage), various
assumptions concerning modelling of hydraulic structures, various techniques for
model calibration and verification, various assumptions concerning development
conditions within the catchment, etc. The geographical coverage of each study was
also different in most cases;
* given the nature of the Haslams Creek catchment, the models adopted for a flood
study or floodplain management study needed to be able to simulate:
(1)channel storage and floodplain storage adjacent to the existing channel system,
especially upstream of the numerous railway and road crossings;
(2) affluxes at road and railway structures;
(3) a mixture of subcritical and supercritical flow, including hydraulic jumps;
(4) secondary overland flowpaths;
(5) pipe system capacities, pit losses and flow in pipes with submerged outlets;
* none of the previous studies had adequately modelled all of these aspects. Most of
the previous studies had a limited geographical coverage. Also a number of small
changes have occurred in the catchment and the channel systems since the studies
were completed.

Consequently, the study recommended that a new flood study be undertaken for the
branches upstream of the M4 Motorway.

The report included recommendations regarding hydrologic and hydraulic modelling. That
is, a combination of RAFTS and ILSAX models were deemed suitable for the hydrologic
modelling of the open channels and piped systems respectively and a combination of
MIKE-11 and/or HEC-RAS models were considered suitable for the hydraulic modelling
of the open channels with hydraulic gradeline analyses of each pipe drainage system.

The methodology adopted for this report is consistent with those recommendations and
is detailed in Section 4.
In accordance with Council's study brief (reference Appendix A) this report provides
estimates of:

* design discharges for both the open channel and piped drainage systems for 5, 20
and 100 year average recurrence interval (ARI) and probable maximum flood (PMF)
events;
* design flood levels, energy levels and velocities along the open channel system for
the 5, 20 ~nd 100 year ARI and PMF events;
* hydraulic and hazard categories for areas subject to overbank flooding; and
* the capacity of the trunk pipe drainage system, the overland flow discharge and the
approximate depth of overland flow.

Full description

Haslams Creek - Flood Study

This dataset is part of a larger collection

Click to explore relationships graph

Spatial Coverage And Location

text: New South Wales (NSW81093)

Subjects

User Contributed Tags    

Login to tag this record with meaningful keywords to make it easier to discover

Identifiers