Data

Data: Levelised cost of hydrogen

Commonwealth Scientific and Industrial Research Organisation
Hayward, Jenny
Viewed: [[ro.stat.viewed]] Cited: [[ro.stat.cited]] Accessed: [[ro.stat.accessed]]
ctx_ver=Z39.88-2004&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Adc&rfr_id=info%3Asid%2FANDS&rft_id=info:doi10.25919/4185-1a85&rft.title=Data: Levelised cost of hydrogen&rft.identifier=https://doi.org/10.25919/4185-1a85&rft.publisher=Commonwealth Scientific and Industrial Research Organisation&rft.description=Levelised cost of hydrogen calculated using cost and performance assumptions from various recent studies.\nLineage: The levelised cost of hydrogen was calculated from 2021 until 2050 using capital costs from CSIRO publications and the IEA. The costs of electricity were from an internal CSIRO calculation.&rft.creator=Hayward, Jenny &rft.date=2022&rft.edition=v1&rft.relation=http://hdl.handle.net/102.100.100/421099?index=1&rft.relation=https://doi.org/10.25919/8rpx-0666&rft.relation=https://doi.org/10.25919/5eb5ac371d372&rft_rights=Creative Commons Attribution 4.0 International Licence https://creativecommons.org/licenses/by/4.0/&rft_rights=Data is accessible online and may be reused in accordance with licence conditions&rft_rights=All Rights (including copyright) CSIRO 2021.&rft_subject=levelised cost of hydrogen&rft_subject=electrolysis&rft_subject=hydrogen production&rft_subject=Economic models and forecasting&rft_subject=Econometrics&rft_subject=ECONOMICS&rft.type=dataset&rft.language=English Access the data

Licence & Rights:

Open Licence view details
CC-BY

Creative Commons Attribution 4.0 International Licence
https://creativecommons.org/licenses/by/4.0/

Data is accessible online and may be reused in accordance with licence conditions

All Rights (including copyright) CSIRO 2021.

Access:

Open view details

Accessible for free

Contact Information



Brief description

Levelised cost of hydrogen calculated using cost and performance assumptions from various recent studies.
Lineage: The levelised cost of hydrogen was calculated from 2021 until 2050 using capital costs from CSIRO publications and the IEA. The costs of electricity were from an internal CSIRO calculation.

Available: 2022-02-01

Data time period: 2020-03-01 to 2021-06-30

This dataset is part of a larger collection

Click to explore relationships graph
Subjects

User Contributed Tags    

Login to tag this record with meaningful keywords to make it easier to discover