Full description
'Australian National Moorings Network' (ANMN) is a facility of the Australian 'Integrated Marine Observing System' (IMOS) project. This data set was collected by the ANMN sub-facility 'National Reference Systems' (NRS).Lineage
Maintenance and Update Frequency: asNeededNotes
CreditAustralian Institute of Marine Science (AIMS)
Australia's Integrated Marine Observing System (IMOS) is enabled by the National Collaborative Research Infrastructure Strategy (NCRIS). It is operated by a consortium of institutions as an unincorporated joint venture, with the University of Tasmania as Lead Agent.
Queensland State Government
Darwin Port
Modified: 02 07 2025
text: westlimit=130.7151; southlimit=-12.34326; eastlimit=130.7151; northlimit=-12.34326
text: westlimit=130.6961; southlimit=-12.33731; eastlimit=130.6961; northlimit=-12.33731
User Contributed Tags
Login to tag this record with meaningful keywords to make it easier to discover
Darwin NRS Buoy Rain Intensity Daily Averages
Darwin NRS Buoy Rain Duration Daily Averages
Darwin NRS Buoy Rain Accumulation Daily Averages
global : 9c7a97f2-a06a-446c-9712-c6e719da0d24
- global : aaf1d632-8965-4193-8209-2c99a8b7c9e3