Data

Canley Corridor Overland Flood Study

data.nsw.gov.au
Viewed: [[ro.stat.viewed]] Cited: [[ro.stat.cited]] Accessed: [[ro.stat.accessed]]
ctx_ver=Z39.88-2004&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Adc&rfr_id=info%3Asid%2FANDS&rft_id=http://data.nsw.gov.au/data/dataset/fdp-canley-corridor-overland-flood-study-report&rft.title=Canley Corridor Overland Flood Study&rft.identifier=http://data.nsw.gov.au/data/dataset/fdp-canley-corridor-overland-flood-study-report&rft.publisher=data.nsw.gov.au&rft.description=This report is structured as follows:\r\n##Section 1 – Introduction\r\n##Section 2 – Background: \r\nExplanation of the need for this overland flow study, of Fairfield’s\r\noverland flow study program, the situation of this study area, the study objectives, and the\r\nhistory of flooding in the catchment\r\n##Section 3 – Available Data: \r\nOverview of the data collection process for this study\r\n##Section 4 – Catchment and Stormwater Model Development: \r\nExplanation of the\r\ndevelopment of the different hydrological and stormwater modelling approaches used in this\r\nstudy\r\n##Section 5 – Hydraulic Modelling: \r\nBackground to the development of the two-dimensional\r\nhydraulic model used in this study\r\n##Section 6 – Sensitivity of Hydrological Modelling: \r\nEvaluation of the different hydrological\r\nand stormwater modelling approaches and comparison of their results\r\n##Section 7 – Flood Mapping Results: \r\nUse of the study modelling to derive flood extent\r\nmapping and flood risk precinct mapping\r\n##Section 8 – Conclusions: \r\nKey conclusions from the study regarding modelling methodology\r\nand results.\r\n\r\n#Study Area\r\nThe study area for Canley Corridor Overland Flood Study is located south west of Orphan School\r\nCreek, between the suburbs of Canley Vale and Canley Heights and Cabramatta. The Canley\r\nCorridor catchment has a north easterly aspect and drains overland into Orphan School Creek,\r\nwhich is the main tributary of Prospect Creek.\r\nThe 258 hectare catchment has a range of land uses including residential, commercial and light\r\nindustrial. The upper and mid catchment area is largely medium density residential. The lower\r\ncatchment includes a range of commercial and industrial areas, separated from Orphan School\r\nCreek by an open space corridor.\r\n\r\n#Study Objectives\r\nKey objectives of this study are:\r\n\r\n* 1) To test the sensitivity of overland flood modelling using different assumptions of the capacity\r\nof the existing stormwater drainage system. It will compare the drainage system at different\r\nlevels of detail, and evaluate the benefit provided by increasingly detailed models. Conclusions\r\nfrom this study will establish the methodology of subsequent studies for the remainder of the\r\nLGA catchments\r\n* 2) To identify the major overland flow paths within the Canley Corridor catchment study area.\r\nThe study area is detailed in Section 2.4 and includes parts of sub-catchments 13, 14, 15 and\r\n16 as identified in the preliminary city-wide Overland Flood Study (SKM, 2004). The Canley\r\nCorridor study area is shown in Figure 1-1.\r\n\r\nOther objectives of the study are to:\r\n\r\n* Identify properties at risk of local overland flooding\r\n* Assess provisional flood hazard to identified properties due to local overland flooding for the\r\n1% AEP (Annual Exceedance Probability) and the PMF (Probable Maximum Flood)\r\n* Carry out field verification of identified overland flow paths at selected locations\r\n* Prepare flood extent and flood risk precinct maps for the study area for the 1% AEP and PMF\r\nevents\r\n* Produce flood results (flood level, velocity and flow) for the 5, 20, 100 ARI year and PMF\r\nevents\r\n\r\n#Conclusions\r\n#Hydrologic Modelling Methodology\r\nComparison of the different hydrologic models indicates that while detailed modelling provides a\r\nmore precise picture of flooding, this would not necessarily translate into a different assessment of\r\nflood risk, or in significantly different planning controls being applied. All three hydrologic\r\nmodelling approaches (Detailed DRAINS, Limited DRAINS and RAFTS) resulted in similar high\r\nflood risk areas being identified along the main overland flow paths, and reproduced the known\r\nhistorical ‘trouble spots’ within the catchment. However the simpler models tended to overestimate\r\nflood risk due to coarser representation of flow travel times and artificial concentration of flows at\r\nfewer inflow boundaries.\r\n\r\nProduction of a detailed DRAINS model including all pits and pipes in the catchment was\r\nestimated to be four to five times more expensive than production of a limited DRAINS model, and\r\napproximately 14 times more expensive than production of a RAFTS model. This reflects the\r\ndifferent amount of survey data required and the complexity of the model construction.\r\nThe preferred approach identified by the study is a limited DRAINS model representing larger\r\nsized pipes in the stormwater network. This approach can be as acceptable in determining\r\nsignificant areas of risk as a detailed DRAINS model approach, if the extent of the modelling\r\nstormwater network reflects known trouble spots in the catchment, and represents the major\r\nelements of the trunk drainage system.\r\n#Canley Corridor Flood Behaviour and Risk\r\nPeak flood depths on most properties are less than 0.5 metres, although there are some areas in the\r\nupper catchment where depths are between 0.5 and 1.0 metres. Similarly, flow velocities across\r\nmost properties are generally below 0.5 metres per second, although higher velocities are seen in\r\nmany streets and across some upper catchment properties.\r\n\r\nA “Zone of Significant Flow” has also been identified where it is important that overland flowpaths\r\nare kept clear. It contains much of the 100 year ARI extent in the upper catchment, where flowpath\r\nblockage caused by fences, large buildings and debris can significantly increase water levels and\r\ndivert water onto nearby properties.\r\n\r\nThese maps only represent flooding due to runoff from within the Canley Corridor catchment.\r\n\r\nThose parts of the Corridor along the banks of Orphan School Creek may also be at risk from\r\nmainstream flooding, generated in the upper Orphan School Creek catchment to the north and west\r\nof the Canley Corridor. Mainstream flood extents for Orphan School Creek are reported in the\r\nFlood Study for Orphan School Creek, Green Valley Creek and Clear Paddock Creek (Sinclair\r\nKnight Merz & Fairfield Consulting Services, 2008).\r\nThe Canley Corridor Overland Flood Study has been successful in achieving its objectives which\r\nwere to:\r\n\r\n* test the sensitivity of overland flood modelling to different assumptions about the capacity of\r\nthe stormwater drainage system\r\n* define flood behaviour and identify the major overland flow paths within the Canley Corridor\r\ncatchment, and\r\n* identify properties at risk of local overland flooding and to prepare flood risk precinct maps.\r\n\r\nThe study has also:\r\n\r\n* established methodologies for modelling and flood risk mapping for future overland flood\r\nstudies for Fairfield LGA\r\n* provided maps which are more meaningful to Council officers, development proponents\r\nand the community\r\n* provided a good foundation from which to prepare the floodplain risk management study\r\nand plan, particularly with regards to flood emergency response, as the next step in the\r\nfloodplain risk management process&rft.creator=Anonymous&rft.date=2026&rft.coverage=New South Wales (NSW81093)&rft_rights=Creative Commons Attribution http://www.opendefinition.org/licenses/cc-by&rft_subject=Canley Corridor&rft_subject=Canley Vale&rft_subject=hydraulic model&rft.type=dataset&rft.language=English Access the data

Licence & Rights:

Open Licence view details
CC-BY

Creative Commons Attribution
http://www.opendefinition.org/licenses/cc-by

Access:

Open

Brief description

This report is structured as follows:
##Section 1 – Introduction
##Section 2 – Background:
Explanation of the need for this overland flow study, of Fairfield’s
overland flow study program, the situation of this study area, the study objectives, and the
history of flooding in the catchment
##Section 3 – Available Data:
Overview of the data collection process for this study
##Section 4 – Catchment and Stormwater Model Development:
Explanation of the
development of the different hydrological and stormwater modelling approaches used in this
study
##Section 5 – Hydraulic Modelling:
Background to the development of the two-dimensional
hydraulic model used in this study
##Section 6 – Sensitivity of Hydrological Modelling:
Evaluation of the different hydrological
and stormwater modelling approaches and comparison of their results
##Section 7 – Flood Mapping Results:
Use of the study modelling to derive flood extent
mapping and flood risk precinct mapping
##Section 8 – Conclusions:
Key conclusions from the study regarding modelling methodology
and results.

#Study Area
The study area for Canley Corridor Overland Flood Study is located south west of Orphan School
Creek, between the suburbs of Canley Vale and Canley Heights and Cabramatta. The Canley
Corridor catchment has a north easterly aspect and drains overland into Orphan School Creek,
which is the main tributary of Prospect Creek.
The 258 hectare catchment has a range of land uses including residential, commercial and light
industrial. The upper and mid catchment area is largely medium density residential. The lower
catchment includes a range of commercial and industrial areas, separated from Orphan School
Creek by an open space corridor.

#Study Objectives
Key objectives of this study are:

* 1) To test the sensitivity of overland flood modelling using different assumptions of the capacity
of the existing stormwater drainage system. It will compare the drainage system at different
levels of detail, and evaluate the benefit provided by increasingly detailed models. Conclusions
from this study will establish the methodology of subsequent studies for the remainder of the
LGA catchments
* 2) To identify the major overland flow paths within the Canley Corridor catchment study area.
The study area is detailed in Section 2.4 and includes parts of sub-catchments 13, 14, 15 and
16 as identified in the preliminary city-wide Overland Flood Study (SKM, 2004). The Canley
Corridor study area is shown in Figure 1-1.

Other objectives of the study are to:

* Identify properties at risk of local overland flooding
* Assess provisional flood hazard to identified properties due to local overland flooding for the
1% AEP (Annual Exceedance Probability) and the PMF (Probable Maximum Flood)
* Carry out field verification of identified overland flow paths at selected locations
* Prepare flood extent and flood risk precinct maps for the study area for the 1% AEP and PMF
events
* Produce flood results (flood level, velocity and flow) for the 5, 20, 100 ARI year and PMF
events

#Conclusions
#Hydrologic Modelling Methodology
Comparison of the different hydrologic models indicates that while detailed modelling provides a
more precise picture of flooding, this would not necessarily translate into a different assessment of
flood risk, or in significantly different planning controls being applied. All three hydrologic
modelling approaches (Detailed DRAINS, Limited DRAINS and RAFTS) resulted in similar high
flood risk areas being identified along the main overland flow paths, and reproduced the known
historical ‘trouble spots’ within the catchment. However the simpler models tended to overestimate
flood risk due to coarser representation of flow travel times and artificial concentration of flows at
fewer inflow boundaries.

Production of a detailed DRAINS model including all pits and pipes in the catchment was
estimated to be four to five times more expensive than production of a limited DRAINS model, and
approximately 14 times more expensive than production of a RAFTS model. This reflects the
different amount of survey data required and the complexity of the model construction.
The preferred approach identified by the study is a limited DRAINS model representing larger
sized pipes in the stormwater network. This approach can be as acceptable in determining
significant areas of risk as a detailed DRAINS model approach, if the extent of the modelling
stormwater network reflects known trouble spots in the catchment, and represents the major
elements of the trunk drainage system.
#Canley Corridor Flood Behaviour and Risk
Peak flood depths on most properties are less than 0.5 metres, although there are some areas in the
upper catchment where depths are between 0.5 and 1.0 metres. Similarly, flow velocities across
most properties are generally below 0.5 metres per second, although higher velocities are seen in
many streets and across some upper catchment properties.

A “Zone of Significant Flow” has also been identified where it is important that overland flowpaths
are kept clear. It contains much of the 100 year ARI extent in the upper catchment, where flowpath
blockage caused by fences, large buildings and debris can significantly increase water levels and
divert water onto nearby properties.

These maps only represent flooding due to runoff from within the Canley Corridor catchment.

Those parts of the Corridor along the banks of Orphan School Creek may also be at risk from
mainstream flooding, generated in the upper Orphan School Creek catchment to the north and west
of the Canley Corridor. Mainstream flood extents for Orphan School Creek are reported in the
Flood Study for Orphan School Creek, Green Valley Creek and Clear Paddock Creek (Sinclair
Knight Merz & Fairfield Consulting Services, 2008).
The Canley Corridor Overland Flood Study has been successful in achieving its objectives which
were to:

* test the sensitivity of overland flood modelling to different assumptions about the capacity of
the stormwater drainage system
* define flood behaviour and identify the major overland flow paths within the Canley Corridor
catchment, and
* identify properties at risk of local overland flooding and to prepare flood risk precinct maps.

The study has also:

* established methodologies for modelling and flood risk mapping for future overland flood
studies for Fairfield LGA
* provided maps which are more meaningful to Council officers, development proponents
and the community
* provided a good foundation from which to prepare the floodplain risk management study
and plan, particularly with regards to flood emergency response, as the next step in the
floodplain risk management process

Spatial Coverage And Location

text: New South Wales (NSW81093)

Subjects

User Contributed Tags    

Login to tag this record with meaningful keywords to make it easier to discover

Other Information
Identifiers
ACN 633 798 857