Brief description
AM06 borehole drilled January 2010.Profiling measurements conducted to test borehole diameter integrity.
Lineage
Progress Code: completedBorehole diameter was attempted to be wide enough to allow passage of a large ADCP instrument ... this worked well in the upper parts of the borehole but not at great depth in the permeable marine ice layer (530-600 m).
Note - depths and altitudes provided in spatial coverage are referenced back to sea level.
The minimum depth asl refers to the height of the ice surface.
Data time period: 2010-01-07 to 2011-01-08
text: westlimit=71.3679; southlimit=-70.2428; eastlimit=71.3679; northlimit=-70.2428
User Contributed Tags
Login to tag this record with meaningful keywords to make it easier to discover