Brief description
AM01 borehole drilled January 2002.Profiling measurements conducted to test borehole diameter integrity.
AM01b borehole drilled mid-December 2003.
No new caliper data collected due to faulty wiring on instrument winch slip ring.
Lineage
Progress Code: completedBorehole diameter greatly enlarged at two depths: (a) 60 m at level of sub-surface water well and (b) 376 m where hydraulic connection was first made with ocean cavity beneath shelf (probably through englacial conduits in marine ice layer.
Note - depths provided in spatial coverage are referenced back to sea level.
The minimum depth of 65 metres asl refers to the height of the ice surface.
Data time period: 2002-01-09 to 2002-01-10
text: westlimit=71.42; southlimit=-69.44; eastlimit=71.42; northlimit=-69.44
User Contributed Tags
Login to tag this record with meaningful keywords to make it easier to discover