Data

GenCost project data

Commonwealth Scientific and Industrial Research Organisation
Graham, Paul ; Hayward, Jenny ; Foster, James ; Havas, Lisa
Viewed: [[ro.stat.viewed]] Cited: [[ro.stat.cited]] Accessed: [[ro.stat.accessed]]
ctx_ver=Z39.88-2004&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Adc&rfr_id=info%3Asid%2FANDS&rft_id=info:doi10.25919/9656-6w40&rft.title=GenCost project data&rft.identifier=10.25919/9656-6w40&rft.publisher=Commonwealth Scientific and Industrial Research Organisation (CSIRO)&rft.description=This repository provides data from the GenCost project. The GenCost project is a collaboration between CSIRO and AEMO, together with stakeholder input, to deliver an annual process of updating electricity generation and storage costs. Each report incorporates updated current and future cost estimates and global electricity scenarios.Current costs are updated by external engineering consulting firms and form the basis of CSIRO projections. The projection methodology is grounded in a global electricity generation and capital cost projection model recognising that cost reductions experienced in Australia are largely a function of global technology deployment. The potential for local learning is also recognised.&rft.creator=Graham, Paul &rft.creator=Hayward, Jenny &rft.creator=Foster, James &rft.creator=Havas, Lisa &rft.date=2023&rft.edition=v11&rft.relation=https://doi.org/10.25919/5c587da8cafe7&rft.relation=http://hdl.handle.net/102.100.100/266563?index=1&rft.relation=https://doi.org/10.25919/5eb5ac371d372&rft.relation=https://doi.org/10.25919/16j7-fc07&rft.relation=https://doi.org/10.25919/8rpx-0666&rft.relation=http://hdl.handle.net/102.100.100/433379?index=1&rft.relation=https://doi.org/10.25919/mb22-c107&rft.relation=https://publications.csiro.au/publications/publication/PIcsiro:EP2022-5511&rft.relation=http://hdl.handle.net/102.100.100/487557?index=1&rft.relation=http://hdl.handle.net/102.100.100/602870?index=1&rft.coverage=&rft_rights=All Rights (including copyright) CSIRO 2020.&rft_rights=Creative Commons Attribution https://creativecommons.org/licenses/by/4.0/&rft_subject=Electricity&rft_subject=generation&rft_subject=storage&rft_subject=cost&rft_subject=projections&rft_subject=Economic models and forecasting&rft_subject=Econometrics&rft_subject=ECONOMICS&rft.type=dataset&rft.language=English Access the data

Licence & Rights:

Open Licence view details
CC-BY

Creative Commons Attribution
https://creativecommons.org/licenses/by/4.0/

All Rights (including copyright) CSIRO 2020.

Access:

Open view details

Data is accessible online and may be reused in accordance with licence conditions

Brief description

This repository provides data from the GenCost project. The GenCost project is a collaboration between CSIRO and AEMO, together with stakeholder input, to deliver an annual process of updating electricity generation and storage costs. Each report incorporates updated current and future cost estimates and global electricity scenarios.

Lineage

Current costs are updated by external engineering consulting firms and form the basis of CSIRO projections. The projection methodology is grounded in a global electricity generation and capital cost projection model recognising that cost reductions experienced in Australia are largely a function of global technology deployment. The potential for local learning is also recognised.

Data time period: 2018-01-01 to 2050-01-01

This dataset is part of a larger collection

Click to explore relationships graph
Subjects

User Contributed Tags    

Login to tag this record with meaningful keywords to make it easier to discover

Identifiers